Patagonia Stealth Switch Pack 3L - Bobcat Brown
Patagonia Stealth Switch Pack 3L - Bobcat Brown
Patagonia Stealth Switch Pack 3L - Bobcat Brown

Patagonia Stealth Switch Pack 3L - Bobcat Brown

Holiday Special

Regular price$65.00
/
  • Low stock - 2 items left

Sometimes a fly box, a few essential tools and a good pair of boots are all you need. Low bulk, lightweight and versatile, the Stealth Switch Pack 3L was engineered for the minimalist, on-the-go angler and can attach to wader suspenders, wader belts, other packs or even raft straps. Made in a Fair Trade Certified™ factory.

  • Designed to work as a lightweight, unobtrusive chest pack or a minimal hip pack, or be clipped to another pack to add versatile carrying capacity
  • Features include hemo and zinger docks on the sides of the pack, a fly patch on the face, multiple lash points to keep essentials close, an embedded magnet on the pack front, and corrosion-resistant zippers
  • Two zippered stretch pockets on the pack face, one zippered pocket on the back of the pack, and a roomy, zippered main pocket easily accommodates a large fly box
  • Made in a Fair Trade Certified™ factory, which means the people who made this product earned a premium for their labor
Weight

189.94 g (6.7 oz)

Weight in Oz.

6.7

Fabric

Shell: 8.7-oz 300-denier 100% postconsumer recycled polyester ripstop with a postindustrial recycled TPU-film laminate. Lining: 3-oz 200-denier 100% recycled polyester plain weave with a PU coating. Lower-front pockets: 7.1-oz 72% recycled nylon/28% spandex power mesh. Webbing: 100% recycled nylon. Cord: 100% recycled polyester. Fabrics (except shell) are certified as bluesign® approved. Made in a Fair Trade Certified™ factory

You may also like